HARRIS ACADEMY, CLAPHAM
Project:
Harris Academy
Client:
Kier
Location:
Clapham, London
Overview:
A project for DfE in Clapham, TGM helped Kier Construction with the Drylining and SFS (design, supply and installation) packages on a circa £1.5m contract value project for a new sixth form block for Harris Academy. TGM showcased their attention to detail throughout the building with Acoustic Rafts and Wall Panels throughout the building.